铸铁护栏及预埋件安装工艺!

来源:http://www.zgcjxdw.com添加时间:2020-07-06 17:02:30

  下面山东铸铁护栏为大家介绍一下铸铁护栏及预埋件安装工艺:

  The following Shandong cast iron guardrail introduces the installation process of cast iron guardrail and embedded parts:

  铸铁护栏水平安装工艺:铸铁护栏均按照所提供的标准线来进行水平安装。

  Cast iron guardrail horizontal installation process: cast iron guardrail is installed horizontally according to the standard line provided.

3d捕鱼  铸铁护栏安装流程:

3d捕鱼  Installation process of cast iron guardrail:

  1.产品到达施工现场后按图纸上所规定的位置及尺寸准确安装就位,确定好标高及垂直平整度。应按照甲方要求与图纸设计要求进行定位,确保达到设计要求与验收规范。

  1. After arriving at the construction site, the products shall be installed in place according to the position and size specified in the drawings, and the elevation and vertical flatness shall be determined. Positioning shall be carried out according to Party A's requirements and drawing design requirements to ensure that the design requirements and acceptance specifications are met.

  2.预埋件安装根据图纸设计要求和施工现场的实际情况准确无误的定位,避免造成不在一条平行线上。

                                         

山东铸铁护栏

  2。 The installation of embedded parts shall be accurately positioned according to the design requirements of drawings and the actual situation of the construction site, so as to avoid not being on a parallel line。

  3.铸铁护栏安装按所提供的标准线抄水平定位安装,预埋间距根据现场尺寸及图纸设计要求,安装定位。

  3. The cast iron guardrail shall be installed horizontally according to the provided standard line, and the embedded spacing shall be installed and positioned according to the site size and drawing design requirements.

3d捕鱼  4.安装偏差必须符合国家规定和设计要求,达到验收标准。

  4. The installation deviation must meet the national regulations and design requirements, and meet the acceptance standards.

  5.预埋件、铸铁护栏安装必须牢固,安装偏差根据国家规定和设计要求:直线度<3mm,垂直度<3mm,栏杆间距误差<3mm,对角线误差<3mm,预埋件垂直误差<3mm,水平误差<3mm。

  5. The embedded parts and cast iron guardrail must be installed firmly, and the installation deviation shall be in accordance with the national regulations and design requirements: straightness < 3mm, verticality < 3mm, spacing error of railings < 3mm, diagonal error < 3mm, vertical error of embedded parts < 3mm, horizontal error < 3mm.

  6.预埋件安装定位准确无误经验收后刷两道防锈漆,再进行铁艺栏杆安装。

  6. The installation and positioning of embedded parts shall be accurate. After acceptance, two layers of antirust paint shall be applied, and then the iron railing shall be installed.

  以上介绍的是铸铁护栏及预埋件安装工艺,希望对大家有所帮助,想要了解更多内容欢迎点击咨询山东铸铁护栏http://www.zgcjxdw.com官网。

  The above is the cast iron guardrail and embedded parts installation process, hope to help you, want to know more, welcome to consult Shandong cast iron guardrail http://www。jnwszy。com Official website。



  • 版权所有:济南顺健金属制品有限公司 地址:山东省济南市天桥区金牛建材市场  
  • 电话:  手机号:18706412842 本网站由提供技术支持  流量统计:
二维码
济南万顺铸业有限公司主要为大家提供山东球墨铸铁井盖铸铁护栏落水斗给水管排水管暖气片等产品的批量制作和安装服务,欢迎大家前来选购!
bet36体育在线 隔一投注法 白姐精选资料二四六 一肖中特免费资料公开选料 神扑克app下载 彩票大赢家 彩票大赢家 一肖中特免费资料公开选料 白小姐四不像必选一肖 白姐精选资料二四六